Bottomhole Area Cleanout from Proppant and Sand Bridges
Bottomhole Area Cleanout from Proppant and Sand Bridges
Cleanout of the bottomhole area is a critical operation for restoring and maintaining well productivity - particularly after hydraulic fracturing (frac) operations or in wells experiencing severe sand ingress. We carry out integrated cleanout operations to remove proppant and sand deposits from both the bottomhole area and the wellbore itself, utilizing specialized equipment.
We Offer:
- Post-Frac Proppant Removal:
Residual proppant left after hydraulic fracturing can clog downhole screens, reduce formation permeability, and cause abrasive wear of the equipment. - Sand Bridge Cleanout:
Sand bridges are a common cause of reduced production rates, elevated bottomhole pressure, and sticking. - Integrated Approach:
Cleanout operations can be performed as a standalone service or as part of workover or well intervention operations. We provide:
– Equipment selection tailored to specific downhole complications.
– Hydraulic modeling and optimal operating parameter design,
– Real-time monitoring of abrasive wear,
– Cuttings and fluid sample analysis,
– Full engineering support throughout the operations.
Our Advantages:
Use of high-tech, proprietary equipment engineered for aggressive environments and challenging well conditions
Team of experienced engineers with field-proven expertise across Russia and the neighboring countries
Rapid mobilization capability- crews ready to deploy on short notice
Results:
Restored well productivity
Prevention of downhole failures and sticking
Extended interval between workovers
Contact us and we will develop the optimal cleanout solution for your well, taking into account its geometry, operational history, and specific downhole challenges.
Consult with a specialist
Leave a request and our specialist will contact you for a consultation Leave a request